
Underground Utilities
Ditchdiggers is skilled in the installation of both pressure water and sewer force mains as well as gravity sewer mains and collection systems. Along with these municipal water and sewer systems our crews are very well versed in the installation of stormwater collection and drainage systems. Storm water collection systems and pipe requirements in excess of 72 inches in diameter have been installed in various applications. Box culvert systems for large transit systems have also been perfected with these installations being performed while still maintaining traffic flow.